Doc: IT/99-0119 X P T
Date: March 15, 1999
Project: Administrative
Ref. Doc:
Reply to: Monica Vago
Phone: 202-626-5739
email: mvago@itic.org
DRAFT AGENDA
National Committee for Information Technology Standards
Meeting Number 8
Sybase, Inc
3665 Discovery Drive
Boulder, CO 80303
Tel. 303-413-4000
Fax. 303-413-4216
March 30 - April 1, 1999
1. Administrative
1.1 Call to Order - Ms. Higginbottom1.2 Membership and Attendance
1.2.1 Introduction of Attendees and New Members1.3 Approval of the Minutes of the Previous Meeting1.2.2 Roll Call of Members in Jeopardy Due to Failure to Attend Meetings
1.2.3 Roll Call of Members in Jeopardy Due to Failure to Return Letter Ballots
1.2.4 Membership Report
REF: IT/99-0083, IT/99-0093, IT/99-0094, IT/99-0098, IT/99-0106
1.3.1 Approval of the Minutes
REF: IT/99-0068
1.3.2 Review of the Action Items
REF: IT/98-0068
2. Chairman's Remarks
3. Approval of the Agenda
3.1 Approval of the Consent AgendaREF: IT/99-0119
3.2 Approval of the Draft Agenda
REF: IT/99-0119
3.3 Review of the Meeting Schedule
REF: IT/99-0119
4. Policy and Procedures - Mr. Zemrowski
4.1 PPC Report4.2 NCITS Standards Copyright Policy
REF: IT/99-0085
4.3 NCITS Antitrust Guidelines
REF: IT/99-0089
4.4 NCITS' Web Copyright and Privacy
REF: IT/99-0090
4.5 NCITS Standards Store - Privacy and Security
REF: IT/99-0111
5. Report of the NCITS Secretariat - Ms. Vago
5.1 NCITS Services5.1.1 Membership Database Update5.2 Management Issues5.1.2 Collaborative Computing/Authoring
5.1.2.1 CASCADE5.1.3 NCITS Standards Store Update5.1.2.2 Collaborative Computing with Internet Standards - Mr. Montgomery
5.2.1 1999 NCITS & ANSI Awards - Ms. McMillan5.3 FinancialsREF: IT/99-0104, IT/99-0105
5.2.2 NCITS Membership/Technology Recruitment - Mr. Neumann
REF: IT/99-0112
5.2.3 NCITS 'Emeritus' Proposal - Ms. Higginbottom
REF: IT/99-0087
6. Standards Operations
6.1 Requests for Approval of New ProjectsNCITS agreed to approve new project proposals at meetings to facilitate discussion of new work prior to adding it to the program of work. Criteria for approval is 2/3, as defined by NCITS SD-2.
6.1.1 Project Proposal for an Amendment to an NCITS Standard6.2 Requests to Revise, Redesignate or Withdraw Existing Projects (Consent Agenda)Project Proposal for Amendment to NCITS 323-1998, High-Performance Parallel Interface - 6400 Mbit/s Physical Layer (HIPPI-6400-PH)
REF: IT/99-0072 -
6.1.2 Project Proposal for a New NCITS Standard
Project Proposal for a New Standard for Magnetic Tape Cartridge for Information Interchange, 0.50 in (12.65 mm) Serial Serpentine, 208-Track, 98 250 BPI (3868 BPMM), DLT 6 Format
REF: IT/99-0079 - Mr. Deese
6.1.3 AT&T Fast Track Proposal -
Image Compression Format for Digital Documents
REF: IT/98-0561, IT/98-0562, IT/99-0109, IT/99-0110 - Mr. Frost
6.1.4 SQLJ Fast Track Proposal -
SQLJ - Part 1: SQL Routines using the JavaTM - Mr. Deutsch
REF: IT/98-0425R, IT/99-0095, IT/99-0096
NCITS agreed to approve changes to the existing program of work through approval of the consent agenda, as discussion was less likely. Criteria for approval of a revised or redesignated project (note project, not standard) is 2/3, as defined by NCITS SD-2, and the criteria for withdrawal of an existing project is a majority.
6.3 Defect Management Document Review
This was transferred from OMC to NCITS. The purpose is to review the results of a TC's action and decide whether NCITS agrees that the correct type of correction was chosen, e.g., editorial errors can be corrected with an erratum, technical changes are published through an amendment.
When the TC that developed the standard has been disbanded, requests for defect management will be directed to NCITS for resolution.
The criteria for approval for all defect management documents requires a 30-day LB and the criteria for approval is 2/3, as defined by NCITS SD-2.
6.3.1 Erratum for NCITS 311:1998, Information Technology - Magnetic Tape Format for Information Interchange - 128-Track, Parallel Serpentine, 12,6 mm (1/2 in), 3400 bpmm (86 360 bpi), Run Length Limited Recording6.4 NCITS Management Reviews (Milestone 5)REF: IT/99-0032 - Mr. Deese
A management review is a self audit of the documentation required to approve a standard. The Secretariat prepares the document, and a liaison reviews the package prior to the meeting. A problem detected here will cause corrective action to be taken before the 6-week ballot to approve the standard or to cancel a 6-week ballot in progress.
No criteria for approval is defined by the NCITS SD-2.
6.4.1 NCITS Management Review (Milestone 5) of: Amendment to X3.137:1988, One- and Two-Sided, Flexible Disk Cartridge for 7958 bpr Use - General, Physical and Magnetic Requirements, Type 3016.6 Monitoring Recommendations for 5-Year MaintenanceREF: IT/99-0031 - Mr. Deese
6.4.2 NCITS Management Review (Milestone 5) of: NCITS 324:199x, Information Technology - High-Performance Parallel Interface - 6400 Mbit/s Physical Switch Control (HIPPI-6400-SC)
REF: IT/99-0075 -
6.4.3 NCITS Management Review (Milestone 5) of: NCITS 326:199x, Draft American National Standard for Information Technology - Fibre Channel- Low Cost 10km Optical 1063 MBaud Interface (100-SM-LC-L)
REF: IT/99-0076 -
6.4.4 NCITS Management Review (Milestone 5) of: X3.62:1987/AM1:199x, Draft American National Standard for Information Systems - Optical Character Recognition (OCR) - Paper Used in OCR Systems Amendment 1
REF: IT/99-0077 - Mr. Winkler
6.4.5 NCITS Management Review (Milestone 5) of: X3.230:1994/AM2, Draft American National Standard for for Information Technology - Fibre Channel - Physical and Signaling Interface (FC-PH) - Amendment 2
REF: IT/99-0097 -
Periodic reviews of standards and technical reports are required by ANSI, JTC 1 and NCITS procedures. The Secretariat notifies each TC of the documents that must be reviewed in a given year. If no action is taken by the TC, action must be taken by NCITS. If the TC that developed the standard no longer exists, the responsibility for the review belongs to NCITS.
Approval for the withdrawal or reaffirmation of technical reports can be a 30-day LB or a meeting vote; the criteria for approval is 2/3, as defined by NCITS SD-2.
Approval for the withdrawal or reaffirmation of standards must obtained through a 6-week LB; the criteria for approval is 2/3, as defined by NCITS SD-2.
REF: IT/99-0051
6.6.1 Recommendations Due in 19966.7 Current Statistics6.6.3 Recommendations Due in 1998
6.6.4 Recommendations Due in 1999
REF: IT/99-0115
NCITS TC Chairs are identified under the agenda item and the NCITS TC Liaisons for the TC are identified in the parentheses following the agenda item.7.1 NCITS Technical Committee Annual Reports
REF: IT/99-0046
7.1.1 J14 / Programming Language FORTH - Ms. Rather (Mr. Kurihara)7.2 NCITS Technical Committee Liaisons (Liaison Listing)REF: IT/99-0082
7.1.2 J16 / SC 22 WG 21 - Programming Language C++ - Mr. Clamage (Mr. Hedquist)
REF: IT/99-0062
7.1.3 L1 / ISO TC 211 - L1 - Geographic Information Systems (GIS) - Mr. Tom (Mr. Deutsch)
REF: IT/99-0092
7.1.4 T2 / SC 22 WG 11 & SC 32 WG 2 - Information Interchange and Interpretation - Mr. Sarris (Mr. Bertine)
7.2.1 Liaison Assignment Status7.3 NCITS Technical Committee Issues7.2.2 Liaison Vacancies
7.3.1 T3 Petition for U.S. TAG Assignments7.4 NCITS Technical Committee OfficersREF: IT/98-0495, MoA for U.S. TAGs for ISO/IEC JTC 1 and its Subgroups , IT/99-0069, IT/99-0070, IT/99-0117
7.3.2 L8 Request to Transfer Projects to L1
REF: IT/99-0015
7.3.3 NCITS R1 Update & Review of ITLB 3554 Results - Mr. Hedquist
7.4.1 Appointment of Technical Committee OfficersREF: IT/99-0103
7.4.1.1 T11.1 Chairman7.4.2 Unanswered Calls and Overdue Training7.4.1.2 T11.3 Chairman
REF: IT/99-0102
8.1 Archive Ad Hoc - Mr. ThewlisREF: IT/99-0113, IT/99-0116
9.1 NCITS B10/AIM USAREF: IT/98-0496, IT/99-0084
9.2 NCITS Study Group on IT Accommodation Update - Mr. LaPlant
10. New Business
10.1 DOD Real-Time Requirements Presentation - Mr. Richards
11. Liaison Activities
11.1 ANSI(1) Report on Information Systems Standards Board (ISSB) - Mr. Silletti11.2 IEEEREF: IT/99-0086
(2) Report on Information Infrastructure Standards Panel (IISP) - Mr. Hogan
REF: IT/99-0088
(1) IEEE Standards Board -11.3 JTC 1 TAG Finance Committee - Mr. Michael(2) IEEE PASC - Mr. Hedquist
REF: IT/99-0107, IT/99-0108
12. NCITS Meetings Schedule
12.1 July 27-29, 1999 Meeting Logistics12.2 Proposed Schedule for Future Meetings
12.3 Duration of Meetings
- July 27-29, 1999 - ITI
- October 12-14, 1999 - Red Bank, NJ
13. Review of Action Items
14. Adjournment
Consent Agenda
6.2 Requests to Revise, Redesignate or Withdraw Existing Projects
REF: IT/99-0073 - Mr. LaPlant
6.2.2 T10 Request to Revise Project 2009-D, Fibre Channel Avionics Environment (FC-AE) to a Technical Report, 2009-DT
REF: IT/98-0487 -
Tuesday, March 30, 1999
Beginning 9:00 AM
Agenda Items 1- 6; except 4 and 6.1.3Wednesday, March 31, 1999
11:00 am Mr. Hedquist (Agenda Item 7.3.3)
1:00 pm Ms. Rather via teleconference (Agenda Item 7.1.1)
2:00 pm Mr. Clamage (Agenda Item 7.1.2)
Beginning 9:00 AM
Agenda Items 7 - 10Thursday, April 1, 19999:00 am Mr. Zemrowski via teleconference (Agenda Item 4)
10:00 am Mr. Frost (Agenda Item 6.1.3)
1:00 pm Mr. LaPlant via teleconference (Agenda Item 9.2)
Beginning 9:00 AM
Agenda Items 11-14